• Skip to main content
  • Skip to secondary menu
  • Skip to footer

Defense Market

Market Insights for Aerospace & Defense Industry

  • Defense Events Calendar
  • Sponsored Post
  • About
    • GDPR
  • Contact

General Dynamics Electric Boat awarded $1.3 billion contract modification for long lead time material for Virginia-class submarines

August 5, 2024 By admin Leave a Comment

GROTON, Conn., Aug. 5, 2024 – General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD), announced today it has been awarded a $1.3 billion undefinitized contract modification allowing Electric Boat to purchase long lead time materials for Virginia Class Block VI submarines as detailed in the U.S. Department of Defense contract award.

“This contract modification sends a crucial demand signal, enabling our suppliers to invest in the capacity and materials needed to increase production volume,” said Kevin Graney, president of General Dynamics Electric Boat. “Consistent funding for the supply base is essential to achieve the high-rate production the Navy requires of the entire submarine enterprise.”

Virginia-class submarines are designed from the keel up for the full range of 21st-century mission requirements, including anti-submarine and surface ship warfare and special operations support. General Dynamics Electric Boat is the prime contractor and lead design yard for the Virginia class and constructs them in a teaming arrangement with HII’s Newport News Shipbuilding in Virginia.

General Dynamics Electric Boat designs, builds, repairs and modernizes nuclear submarines for the U.S. Navy. Headquartered in Groton, Connecticut, it employs more than 23,000 people. More information about General Dynamics Electric Boat is available at www.gdeb.com.

General Dynamics is a global aerospace and defense company that offers a broad portfolio of products and services in business aviation; ship construction and repair; land combat vehicles, weapons systems and munitions; and technology products and services. General Dynamics employs more than 100,000 people worldwide and generated $42.3 billion in revenue in 2023. More information is available at www.gd.com.

SOURCE General Dynamics Electric Boat

Filed Under: News

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Footer

Recent Posts

  • ATARS Meets the M-346: Why Leonardo and Red 6 May Be Rewriting the Logic of Fighter Training
  • Dark Eagle: The U.S. Army’s Long-Range Hypersonic Weapon, Brief Overview
  • The Army Just Launched a Solicitation for a Heavier ISV — Here’s What We Know
  • The ISV’s $308 Million Budget Request — and Why Congress Is Pushing Back
  • From Prototype to Full-Rate Production: The ISV’s Development Timeline
  • ISV Specs and Deployment: How the Army Gets This Vehicle Into a Fight
  • Meet the ISV: The Army’s Lightweight Vehicle Built for Speed Over Armor
  • Affordable Mass: DARPA’s Push for Cheap Missiles Signals a Doctrinal Reset in Modern Warfare
  • Cheap Wins Wars: America’s Late Turn Toward Cost-Asymmetric Weapons
  • From Scrap to Supremacy: 6K Additive’s $1.95M Bet on Rebuilding the U.S. Defense Material Base

Media Partners

  • Market Analysis
  • Market Research Media
The End of Manual Audits: Why AI-Native Accounting Is Not Optional Anymore
Raspberry Pi’s Earnings Beat Signals a Shift From Hobbyist Hardware to Embedded Infrastructure
Betting the Backbone: A Multi-Year Positioning on AMD, Broadcom, and Nvidia
Nvidia’s Groq 3 LPX: The $20B Bet That Could Define the Inference Era
Why Arm’s New AI Chip Changes the Rules of the Game
A Map Without Hormuz: Rewiring Global Oil Flows Through Fragmented Corridors
RoboForce’s $52 Million Raise Signals That Physical AI Is Moving From Demo Stage to Industrial Scale
The Hormuz Crisis: Winners and Losers in the Global Energy Shock
Zohran Mamdani’s Politics of Confiscation
Beyond Shipyards: Stephen Carmel’s Maritime Warning and the Hard Reality of Rebuilding an Oceanic System
Canva Acquires Simtheory and Ortto to Build End-to-End Work Platform
Netflix Price Hikes, The Economics of Dominance in a Saturated Streaming Market
America’s Brands Keep Winning Even as America Itself Slips
Kioxia’s Storage Gambit: Flash Steps Into the AI Memory Hierarchy
Mamdani Strangling New York
The Rise of Faceless Creators: Picsart Launches Persona and Storyline for AI Character-Driven Content
Apple TV Arrives on The Roku Channel, Expanding the Streaming Platform Wars
Why Attraction-Grabbing Stations Win at Tech Events
Why Nvidia Let Go of Arm, and Why It Matters Now
When the Market Wants a Story, Not Numbers: Rethinking AMD’s Q4 Selloff

Media Partners

  • Technologies.org
  • Technology Conferences
  • Cybersecurity Market
How to Actually Use a Raspberry Pi Without Overthinking It
Chapter’s $100 Million Bet on AI for Retirement
Galaxy A57 5G vs A37 5G Review: Samsung Pushes “Everyday AI” Further Down the Stack
Samsung Galaxy A37 5G Review: The Sensible Choice
Samsung Galaxy A57 5G Review: The Mid-Range Bar Gets Higher
AfterQuery Raises $30M at $300M Valuation as the AI Race Collides with Its Real Constraint
Xoople Raises $130M to Build the “System of Record” for the Physical World
AI Looms and the Return of American Apparel Manufacturing
Manna’s Second Act: From Drone Novelty to Logistics Infrastructure
Britain Advances SMR Deployment with £300M Owner’s Engineer Contract
Accelerate 2026, May 21–22, 2026, Salt Palace Convention Center
JSNation 2026, June 11 & June 15, Amsterdam and Remote
ICMC 2026, July 30–31, Long Beach
Elevate 2026, April 22–24, 2026, Atlanta
WWDC 2026, June 8–12, Cupertino & Online
Zip Forward Europe 2026, April 16, 2026, London
AI Summit: Operationalizing Intelligence and Driving Innovation, April 16, 2026, Woburn, Massachusetts
GTC 2026, March 16–19, San Jose
Taiwan’s AI Ecosystem Steps Into the Spotlight at NVIDIA GTC, March 16–19, 2026
COMPUTEX 2026, June 2–5, Taipei
Altum Strategy Group: Cybersecurity in 2026 Is No Longer a Technology Problem
Trent AI and the Security Layer the Agentic Stack Has Been Missing
Gartner Security & Risk Management Summit, June 1–3, 2026, National Harbor, MD
Ashdod Port Has Blocked 134,000 Cyberattacks—and Kept Israel’s Trade Moving
Black Hat Asia 2026, April 23–24, Singapore
World Backup Day 2026: Why Recovery Has Become the Real Test of Cyber Resilience
Cyberhaven Launches Agentic AI Security as Shadow Agents Move Onto the Enterprise Endpoint
Palo Alto Networks Rewrites Security for the Agentic AI Era
RSAC Conference 2026, March 23–26, San Francisco
AI-Speed Warfare Comes to Cybersecurity: Booz Allen’s Vellox Suite Signals a Structural Shift

Copyright © 2022 DefenseMarket.com

Technologies, Market Analysis & Market Research and Exclusive Domains, Photography